UFC - Unified Facilities Criteria: Recent submissions
Now showing items 241-255 of 255
-
UFC 4-010-02
Abstract: FOREWORD (continued)
This specific document is also issued under the authority of DoD Instruction Number 2000.16, DoD Antiterrorism Standards which requires DoD Components to adopt and adhere to common ... -
UFC 4-740-01NF
Abstract: Purpose and Organization
This Design Guide provides criteria to evaluate, plan, program and design Bowling Centers for the purpose of enhancing the quality of life for the Air Force community. This ... -
UFC 3-120-10 CHANGE 1
Abstract: PURPOSE AND SCOPE.
This UFC provides general guidance and outlines technical requirements that apply to both building related and furniture related interior design projects, new construction and ... -
UFC 3-340-02
Abstract: FOREWORD
The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the ... -
UFC 3-430-11
Abstract: PURPOSE AND SCOPE.
This document provides criteria for the design of heating plant instrumentation. A heating plant contains one or more boilers. The plant may be an individual plant serving a single ... -
UFC 3-270-06 CHANGE 1
Abstract: This handbook contains distress definitions and measurement methods for determining the Pavement Condition Index (PCI) of asphalt surfaced airfields. This handbook is based on the references in paragraph 1.7. with the ... -
UFC 3-240-04A
Abstract: PURPOSE AND SCOPE.
This document provides information, guidance, instructions, and criteria for the design of sanitary and industrial wastewater gravity collection systems and pumping facilities.
a. Sewers.
This ... -
UFC 3-230-17FA
Abstract: Purpose and scope.
The purpose of this manual is to discuss normal requirements for design of surface and subsurface drainage systems for military construction other than airfields and heliports at Army, ... -
UFC 4-860-02N
Abstract: PURPOSE AND SCOPE.
This UFC is comprised of two sections. Chapter 1 introduces this UFC and provides a listing of references to other Tri-Service documents closely related to the subject. Appendix A ... -
UFC 3-700-02A
Abstract: This document addresses all phases of construction cost estimating from planning phases through modification estimates during construction. The term construction includes remedial action environmental projects, dredging ... -
UFC 3-440-01 CHANGE 1
Abstract: PURPOSE AND SCOPE. This manual provides guidance for the standard design of active solar energy systems to preheat domestic and service water. The systems treated by this manual are liquid based. Guidelines ... -
UFC 3-250-06
Abstract: Purpose.
This manual presents materials, criteria, and procedures for rapid repair of uncontrolled cracks and spalls in rigid pavements by using epoxy resin grouts, mortars, and concretes. This guidance ... -
UFC 3-240-13FN CHANGE 1
Abstract: PURPOSE AND SCOPE.
This UFC provides an overview of industrial water treatment operations and management. As used in this UFC, the term “industrial water” refers to the water used in military ... -
UFC 4-440-01A
Abstract: The scope of this manual includes general information pertaining to requirements for general design of storage depot facilities. It is not a comprehensive structural design manual. This manual also does not ... -
UFC 4-216-02
Abstract: PURPOSE AND SCOPE.
This UFC is comprised of two sections. Chapter 1 introduces this UFC and provides a listing of references to other Tri-Service documents closely related to the subject. Appendix A ...