• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • UFC - Unified Facilities Criteria
  • View Item
  •   YSE
  • Industrial Standards
  • UFC - Unified Facilities Criteria
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

UFC 3-700-02A

CONSTRUCTION COST ESTIMATES

Organization:
UFC - Unified Facilities Criteria
Year: 2005

Abstract: This document addresses all phases of construction cost estimating from planning phases through modification estimates during construction. The term construction includes remedial action environmental projects, dredging and other construction type work often implemented as service contracts. For the purposes of this document, the term cost engineer applies to all individuals, whether employed by the Government or under contract to the Government, who are engaged in the preparation or review of cost estimates.
Purpose
This document establishes uniform guidance to describe methods, procedures, and formats for the preparation of construction cost estimates for U. S. Army Corps of Engineers projects. Guidance is also provided for the preparation of estimates for project/construction contract modifications.
Applicability
This manual applies to all U. S. Army Corps of Engineers commands having military construction, civil works, and HTRW design responsibility.
URI: https://lib.yabesh.ir/std/handle/yse/4882
Collections :
  • UFC - Unified Facilities Criteria
  • Download PDF : (1.249Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    UFC 3-700-02A

Show full item record

contributor authorUFC - Unified Facilities Criteria
date accessioned2017-09-04T15:07:12Z
date available2017-09-04T15:07:12Z
date copyright03/01/2005
date issued2005
identifier otherLHEPJBAAAAAAAAAA.pdf
identifier urihttps://lib.yabesh.ir/std/handle/yse/4882
description abstractThis document addresses all phases of construction cost estimating from planning phases through modification estimates during construction. The term construction includes remedial action environmental projects, dredging and other construction type work often implemented as service contracts. For the purposes of this document, the term cost engineer applies to all individuals, whether employed by the Government or under contract to the Government, who are engaged in the preparation or review of cost estimates.
Purpose
This document establishes uniform guidance to describe methods, procedures, and formats for the preparation of construction cost estimates for U. S. Army Corps of Engineers projects. Guidance is also provided for the preparation of estimates for project/construction contract modifications.
Applicability
This manual applies to all U. S. Army Corps of Engineers commands having military construction, civil works, and HTRW design responsibility.
languageEnglish
titleUFC 3-700-02Anum
titleCONSTRUCTION COST ESTIMATESen
typestandard
page124
statusActive
treeUFC - Unified Facilities Criteria:;2005
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian