• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • UFC - Unified Facilities Criteria
  • View Item
  •   YSE
  • Industrial Standards
  • UFC - Unified Facilities Criteria
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

UFC 3-210-01A

AREA PLANNING, SITE PLANNING, AND DESIGN

Organization:
UFC - Unified Facilities Criteria
Year: 2004

Abstract: PURPOSE AND SCOPE. These Technical Instructions (TI) describe the Area Development Planning (ADP) and Site Planning processes to be used in preparing plans for construction drawings. The instructions are intended to be used by those individuals given the responsibility for site planning which includes site selection, site development, and site design. The planning procedures that occur in developing a project are described in these instructions. The procedures described are sound and provide a logical process to the end result.
a. Area Development Plan. The ADP is described as providing facility planning at the small area or sub-area level which falls between master planning for an entire installation (RPMP) and site planning for individual buildings (see figure 1-1). The ADP process includes the phases--Identification, Evaluation and Implementation. Identification includes defining the goals and objectives, verifying the program requirements, developing functional relationships, defining spatial relationships, providing an inventory of the area and accomplishing a site visit. Evaluation includes the development of a site analysis that graphically shows the developmental opportunities and constraints for the area. Alternative conceptual plans are developed for evaluation and a determination of a final area development plan is accomplished. Implementation includes the procedures of the Army military construction program for development and execution.
b. Site Plan. Site planning is described as further defining the functional layout for specific buildings or functions and their site. It also includes the phases--Identification, Evaluation, and Implementation. Identification includes defining site specific goals and objectives, verifying the program requirements, developing functional relationships, defining spatial relationships, providing an inventory of the area and accomplishing a site visit. Evaluation includes the development of a site analysis that graphically shows the developmental opportunities and constraints for the site. Alternative conceptual plans are developed for evaluation and a determination of a final site plan is accomplished. The resulting site plan provides the basis for the preparation of construction drawings. Implementation includes the procedures of the Army military construction program for development and execution. The design criteria discusses building design, location and orientation, vehicular circulation and parking, pedestrian circulation, surface water management, utility systems design, lighting design, landscape design, and physical security.
APPLICABILITY. These instructions are applicable to all USACE elements involved in preparing plans for areas, sites, and facilities for Army and civilian installations.
URI: https://lib.yabesh.ir/std/handle/yse/54960
Collections :
  • UFC - Unified Facilities Criteria
  • Download PDF : (4.104Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    UFC 3-210-01A

Show full item record

contributor authorUFC - Unified Facilities Criteria
date accessioned2017-09-04T15:51:48Z
date available2017-09-04T15:51:48Z
date copyright01/16/2004
date issued2004
identifier otherQKXOJBAAAAAAAAAA.pdf
identifier urihttps://lib.yabesh.ir/std/handle/yse/54960
description abstractPURPOSE AND SCOPE. These Technical Instructions (TI) describe the Area Development Planning (ADP) and Site Planning processes to be used in preparing plans for construction drawings. The instructions are intended to be used by those individuals given the responsibility for site planning which includes site selection, site development, and site design. The planning procedures that occur in developing a project are described in these instructions. The procedures described are sound and provide a logical process to the end result.
a. Area Development Plan. The ADP is described as providing facility planning at the small area or sub-area level which falls between master planning for an entire installation (RPMP) and site planning for individual buildings (see figure 1-1). The ADP process includes the phases--Identification, Evaluation and Implementation. Identification includes defining the goals and objectives, verifying the program requirements, developing functional relationships, defining spatial relationships, providing an inventory of the area and accomplishing a site visit. Evaluation includes the development of a site analysis that graphically shows the developmental opportunities and constraints for the area. Alternative conceptual plans are developed for evaluation and a determination of a final area development plan is accomplished. Implementation includes the procedures of the Army military construction program for development and execution.
b. Site Plan. Site planning is described as further defining the functional layout for specific buildings or functions and their site. It also includes the phases--Identification, Evaluation, and Implementation. Identification includes defining site specific goals and objectives, verifying the program requirements, developing functional relationships, defining spatial relationships, providing an inventory of the area and accomplishing a site visit. Evaluation includes the development of a site analysis that graphically shows the developmental opportunities and constraints for the site. Alternative conceptual plans are developed for evaluation and a determination of a final site plan is accomplished. The resulting site plan provides the basis for the preparation of construction drawings. Implementation includes the procedures of the Army military construction program for development and execution. The design criteria discusses building design, location and orientation, vehicular circulation and parking, pedestrian circulation, surface water management, utility systems design, lighting design, landscape design, and physical security.
APPLICABILITY. These instructions are applicable to all USACE elements involved in preparing plans for areas, sites, and facilities for Army and civilian installations.
languageEnglish
titleUFC 3-210-01Anum
titleAREA PLANNING, SITE PLANNING, AND DESIGNen
typestandard
page79
statusActive
treeUFC - Unified Facilities Criteria:;2004
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian