Show simple item record

REQUIREMENTS FOR TIEDOWN, SUSPENSION AND EXTRACTION PROVISIONS ON MILITARY MATERIAL FOR AIRDROP

contributor authorARMY - GL2 - U.S. Army Soldier Systems Center
date accessioned2017-09-04T16:15:46Z
date available2017-09-04T16:15:46Z
date copyright02/03/1997
date issued1997
identifier otherSXZAEAAAAAAAAAAA.pdf
identifier urihttps://lib.yabesh.ir/std/handle/yse/79056
description abstractThis standard establishes the design, number, and location requirements of airdrop tiedown, suspension, and extraction provisions on airdrop items delivered by LVAD.
These requirements are applicable to provisions for:
a. Tiedown of the item to an airdrop platform.
b. Suspension of the item from the recovery parachute system during descent.
c. Extraction of the item from an aircraft in flight.
d. Internal restraint and testing of the provisions.
The requirements specified herein are for the design of new and developmental items of military materiel.
languageEnglish
titleMIL-STD-814Dnum
titleREQUIREMENTS FOR TIEDOWN, SUSPENSION AND EXTRACTION PROVISIONS ON MILITARY MATERIAL FOR AIRDROPen
typestandard
page24
statusActive
treeARMY - GL2 - U.S. Army Soldier Systems Center:;1997
contenttypefulltext
subject keywordsLVAD
subject keywordsParachute
subject keywordsPlatform
subject keywordsRigging


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record