Show simple item record

Use of Hydrodemolition for Concrete Removal in Unbonded Post-Tensioned Systems

contributor authorACI - American Concrete Institute
date accessioned2017-09-04T17:49:25Z
date available2017-09-04T17:49:25Z
date copyright05/01/2002 (R 2011)
date issued2011
identifier otherETXWKEAAAAAAAAAA.pdf
identifier urihttps://lib.yabesh.ir/std/handle/yse/172663
description abstractSummary
During concrete removal around reinforcement, including unbonded post-tensioned systems, potential collateral damage to the repaired structure must be considered relative to future performance. Consequently, selection of the appropriate method of concrete removal is crucial. Hydrodemolition is not recommended for concrete removal if there is a possibility that unbonded post-tensioned systems are within the concrete removal zone.
languageEnglish
titleACI 364.8Tnum
titleUse of Hydrodemolition for Concrete Removal in Unbonded Post-Tensioned Systemsen
typestandard
page2
statusActive
treeACI - American Concrete Institute:;2011
contenttypefulltext
subject keywordsdemolition
subject keywordshydrodemolition
subject keywordspost-tensioning
subject keywordsrepair


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record