• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ACI - American Concrete Institute
  • View Item
  •   YSE
  • Industrial Standards
  • ACI - American Concrete Institute
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

ACI 364.8T

Use of Hydrodemolition for Concrete Removal in Unbonded Post-Tensioned Systems

Organization:
ACI - American Concrete Institute
Year: 2011

Abstract: Summary
During concrete removal around reinforcement, including unbonded post-tensioned systems, potential collateral damage to the repaired structure must be considered relative to future performance. Consequently, selection of the appropriate method of concrete removal is crucial. Hydrodemolition is not recommended for concrete removal if there is a possibility that unbonded post-tensioned systems are within the concrete removal zone.
URI: https://lib.yabesh.ir/std/handle/yse/172663
Subject: demolition
Collections :
  • ACI - American Concrete Institute
  • Download PDF : (64.19Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    ACI 364.8T

Show full item record

contributor authorACI - American Concrete Institute
date accessioned2017-09-04T17:49:25Z
date available2017-09-04T17:49:25Z
date copyright05/01/2002 (R 2011)
date issued2011
identifier otherETXWKEAAAAAAAAAA.pdf
identifier urihttps://lib.yabesh.ir/std/handle/yse/172663
description abstractSummary
During concrete removal around reinforcement, including unbonded post-tensioned systems, potential collateral damage to the repaired structure must be considered relative to future performance. Consequently, selection of the appropriate method of concrete removal is crucial. Hydrodemolition is not recommended for concrete removal if there is a possibility that unbonded post-tensioned systems are within the concrete removal zone.
languageEnglish
titleACI 364.8Tnum
titleUse of Hydrodemolition for Concrete Removal in Unbonded Post-Tensioned Systemsen
typestandard
page2
statusActive
treeACI - American Concrete Institute:;2011
contenttypefulltext
subject keywordsdemolition
subject keywordshydrodemolition
subject keywordspost-tensioning
subject keywordsrepair
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian