NASA-LLIS-0178
Lessons Learned - Solid Rocket Motor (SRM) O-ring Processing
Year: 1992
Abstract: Description of Driving Event:
During processing, employees failed to perform checks of the mandatory inspection points of the orings as specified in the acceptance criteria. However, a review of inspection records for the 51-L orings indicates there is a high probability that the 51-L o-rings were acceptable for launch
During processing, employees failed to perform checks of the mandatory inspection points of the orings as specified in the acceptance criteria. However, a review of inspection records for the 51-L orings indicates there is a high probability that the 51-L o-rings were acceptable for launch
Subject: Risk Management/Assessment
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T18:44:32Z | |
| date available | 2017-09-04T18:44:32Z | |
| date copyright | 33900 | |
| date issued | 1992 | |
| identifier other | KEZCQCAAAAAAAAAA.pdf | |
| identifier uri | https://lib.yabesh.ir/std/handle/yse/225997 | |
| description abstract | Description of Driving Event: During processing, employees failed to perform checks of the mandatory inspection points of the orings as specified in the acceptance criteria. However, a review of inspection records for the 51-L orings indicates there is a high probability that the 51-L o-rings were acceptable for launch | |
| language | English | |
| title | NASA-LLIS-0178 | num |
| title | Lessons Learned - Solid Rocket Motor (SRM) O-ring Processing | en |
| type | standard | |
| page | 2 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;1992 | |
| contenttype | fulltext | |
| subject keywords | Risk Management/Assessment | |
| subject keywords | Test & Verification |

درباره ما