• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • AASHTO - American Association of State Highway and Transportation Officials
  • View Item
  •   YSE
  • Industrial Standards
  • AASHTO - American Association of State Highway and Transportation Officials
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

AASHTO APD

Accelerating project delivery. It´s about time - Revision 1

Organization:
AASHTO - American Association of State Highway and Transportation Officials
Year: 2005

Abstract: Foreword: Our job as state transportation leaders is to maintain and enhance the transportation system Americans use every day. The world we live in and the demands we face are changing very rapidly. There are areas experiencing large population growth. The North American Free Trade Agreement (NAFTA) and the expansion of global commerce have greatly increased freight transport, with more demands to come. Our highways and bridges are aging and have to be rebuilt, often while people are still using them.
All of these changes demand a much quicker means of putting highway improvements into place. I believe it's time we started to consider people's time as the paramount element in the way we plan and deliver a transportation project. Typically, a highway project takes five to seven years. We don't live in that kind of world. We have to speed up the process to get in and out in one to three years.
It's a challenge. We have to look at hard engineering and ask ourselves how do we do things-build things-so that we have the absolute minimum effect on traffic. We have to consider costs, but if we only consider the cost of construction, we're making a mistake. We have to also consider the costs of the total effects on our communities. If you include those costs, then it changes the entire equation.
We have to challenge our fellow agencies to work with us to speed up their reviews and involvement. Because the quicker you get in and out, the less impact you have on a natural environment. We have to challenge our contractors to use all their creativity to deliver their work both faster and at the same quality standards we require.
This report highlights some of the accelerated construction techniques states are using right now. They may not work in every aspect of a job, but they will work in many. In the end, they may not always be less costly. But if the project is finished quicker, that's what citizens want more than anything. And that's who we're here to serve. It's about time.
URI: https://lib.yabesh.ir/std/handle/yse/91193
Collections :
  • AASHTO - American Association of State Highway and Transportation Officials
  • Download PDF : (6.726Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    AASHTO APD

Show full item record

contributor authorAASHTO - American Association of State Highway and Transportation Officials
date accessioned2017-09-04T16:28:01Z
date available2017-09-04T16:28:01Z
date copyright01/01/2005
date issued2005
identifier otherUEROIBAAAAAAAAAA.pdf
identifier urihttps://lib.yabesh.ir/std/handle/yse/91193
description abstractForeword: Our job as state transportation leaders is to maintain and enhance the transportation system Americans use every day. The world we live in and the demands we face are changing very rapidly. There are areas experiencing large population growth. The North American Free Trade Agreement (NAFTA) and the expansion of global commerce have greatly increased freight transport, with more demands to come. Our highways and bridges are aging and have to be rebuilt, often while people are still using them.
All of these changes demand a much quicker means of putting highway improvements into place. I believe it's time we started to consider people's time as the paramount element in the way we plan and deliver a transportation project. Typically, a highway project takes five to seven years. We don't live in that kind of world. We have to speed up the process to get in and out in one to three years.
It's a challenge. We have to look at hard engineering and ask ourselves how do we do things-build things-so that we have the absolute minimum effect on traffic. We have to consider costs, but if we only consider the cost of construction, we're making a mistake. We have to also consider the costs of the total effects on our communities. If you include those costs, then it changes the entire equation.
We have to challenge our fellow agencies to work with us to speed up their reviews and involvement. Because the quicker you get in and out, the less impact you have on a natural environment. We have to challenge our contractors to use all their creativity to deliver their work both faster and at the same quality standards we require.
This report highlights some of the accelerated construction techniques states are using right now. They may not work in every aspect of a job, but they will work in many. In the end, they may not always be less costly. But if the project is finished quicker, that's what citizens want more than anything. And that's who we're here to serve. It's about time.
languageEnglish
titleAASHTO APDnum
titleAccelerating project delivery. It´s about time - Revision 1en
typestandard
page44
statusObsolete
treeAASHTO - American Association of State Highway and Transportation Officials:;2005
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian