• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1520

Lessons Learned - Check Testbed Health Before Beginning or Resuming Flight System Test (2003)

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2005

Abstract: Abstract:
In a scenario that is most likely to occur on severely time-constrained flight projects, system-level testing is interrupted and test time is lost because of unreported changes to the testbed configuration. Use walkthroughs, briefings, startup procedures, and reporting tools to ensure at the beginning of each work shift that test operators are apprised of all changes to the system testbed configuration.
URI: https://lib.yabesh.ir/std/handle/yse/219456
Subject: and launch operations
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (15.34Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1520

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:37:33Z
date available2017-09-04T18:37:33Z
date copyright01/28/2005
date issued2005
identifier otherJNWEQCAAAAAAAAAA.pdf
identifier urihttps://lib.yabesh.ir/std/handle/yse/219456
description abstractAbstract:
In a scenario that is most likely to occur on severely time-constrained flight projects, system-level testing is interrupted and test time is lost because of unreported changes to the testbed configuration. Use walkthroughs, briefings, startup procedures, and reporting tools to ensure at the beginning of each work shift that test operators are apprised of all changes to the system testbed configuration.
languageEnglish
titleNASA-LLIS-1520num
titleLessons Learned - Check Testbed Health Before Beginning or Resuming Flight System Test (2003)en
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2005
contenttypefulltext
subject keywordsand launch operations
subject keywordsassemble
subject keywordsATLO
subject keywordsConfiguration Management
subject keywordsFlight Equipment
subject keywordsGround Equipment
subject keywordsGround Operations
subject keywordsSpacecraft
subject keywordssubsystem test
subject keywordstest
subject keywordsTest & Verification
subject keywordsTest Article
subject keywordstest bed
subject keywordstest configuration
subject keywordsTest Facility
subject keywordstest plan
subject keywordstest procedure
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian